In November 2024, a hybrid heating system from Eco Heating Systems was installed at De Blinkert in Baarn. De Blinkert is a specialized nursing home for people with complex, multi-faceted issues. The nursing home accommodates 93 clients.
Hybrid System
In the nursing home, a GH 75.1 model heat pump is connected to three CB 125 high-efficiency boilers and two Consul+ 35/230 water heaters. The heat pump works in conjunction with the boilers and water heaters to meet the demand for heating and hot water. The system is programmed to deliver heat in the most energy-efficient way possible. The heat pump handles the majority of the heating demand, while the boilers and water heaters provide support during peak loads.
Installation
The system installation was carried out by Schreuder Ruitenbeek Installatiebeheer BV in Leusden.
More information
Would you like to learn more about our company or our products? Read more about our approach, our Central Heating Boilers and (hybrid) Heat Pumps (only available for the Dutch market).


